Fix It! Navy's FRCSW Repairs Damaged CMV-22 Osprey | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sun, Jul 10, 2022

Fix It! Navy's FRCSW Repairs Damaged CMV-22 Osprey

$75 Million Aircraft Sustained A Six-Foot By Three-Foot Crack

Fixing one of the most complex aircraft in the world is NOT for the faint of heart... or those with anything but the greatest of skills. Fleet Readiness Center Southwest (FRCSW) recently added another milestone in its history of maintenance and repair services to naval aircraft by completing an unusual repair to the inner skin of a CMV-22 Osprey.

The right-hand inner composite skin of the $75 million aircraft sustained a six-foot by three-foot crack with other, but minor, composite damage. To provide a comprehensive repair, MV-22 production manager Moises Edillor said FRCSW removed and replaced the 21-foot by four-foot composite panel.

“Since the repair was the first of its kind, planning out the sequence of the maintenance to ensure the new inner skin was not damaged during the installation process proved to be difficult,” he said.

“The new skin had very few pilot holes drilled and the most challenging aspect was drilling more than 1,000 holes into the new composite skin to ensure proper alignment to the aircraft. Our sheet metal mechanics were able to install the new skin with zero defects and delivered the product with high quality craftsmanship.”

The MV-22 (pictured in flight)  is unique to other airframes serviced by the command because of its aluminum, carbon/epoxy composite fuselage and empennage. Its wings and nacelles are also composite and fiberglass. The aircraft, assigned to Fleet Logistics Multi-Mission Squadron 30 (VRM-30), was inducted by the command on January 8 as an in-service repair (ISR), or repairs outside of scheduled maintenance. In total, the ISR required more than 2,500 manhours and was completed through the combined efforts of the command’s artisans and engineering department.

“Twelve V-22 FRCSW personnel worked long hours to complete this critical repair. Trade artisans included sheet metal mechanics, mechanics, electricians and non-destructive inspection (NDI) personnel,” Edillor said.

“Engineering played a key role in the process as they worked quickly in order to create instructions to safely fix the aircraft and get it back into fight-ready status,” he added. FRCSW completed the Osprey on time and within the estimated repair cost of approximately $500,000. It was returned to VRM-30 on June 9.

FMI: www.navair.mil

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC