Air Force’s KC-46A Tanker Development Passes The Halfway Mark | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Apr 14, 2014

Air Force’s KC-46A Tanker Development Passes The Halfway Mark

The Boeing KC-46A Tanker, A Derivative Of The 767, Is Progressing But Behind Schedule

The Air Force’s first KC-46A tanker is going through ground testing at this time and the first flight is scheduled for this summer. If this schedule is maintained, full flight testing will be well underway by the end of this year.

However, according to an article in the Air Force Times, It’s still behind the original scheduled time line. It’s reported that Boeing has delayed production of the refueling boom by almost one year due to design changes and component delivery problems. “There’s always some risk in acquisition programs, and the KC-46A program is executing as well as any acquisition program that I’ve ever been involved in in 27 years,” Maj. Gen. John F. Thompson, the tanker’s executive program officer, told lawmakers April 2.

It’s reported that the Air Force estimated the development of the KC-46A program will be over budget by about $1.1 billion but Thompson is quoted as saying, “The rest of this will be borne by the contractor so long as I haven’t changed requirements, I’ve paid my bills on time. It’s really not a big issue for us from the standpoint of execution.”

According to the report, the Air Force is dealing with budget issues just like all other branches of the military service. In order to meet the congressional budgetary requirements, the Air Force is considering grounding its entire KC-10 fleet of aerial tankers. This grounding is reported to be planned to occur at the same time the KC-46A is brought into service.

(Image from file)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC