Two F-35 Fighters Arrive Together At Edwards AFB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, May 19, 2010

Two F-35 Fighters Arrive Together At Edwards AFB

Non-Stop Flight From Texas To California Signals Test Flight Expansion

Two F-35A Lightning II stealth fighters flew nonstop from their final-assembly site in Fort Worth, TX, to Edwards Air Force Base, CA, Monday, signaling a further expansion of F-35 flight test operations. The arrival is the first in a series that will increase the Edwards F-35 test fleet to at least eight aircraft.


File Photo

U.S. Air Force Test Pilot Lt. Col. Hank "Hog" Griffiths and Lockheed Martin Chief Test Pilot Jon Beesley flew the jets, known as AF-1 and AF-2, nonstop in the first multi-ship, long-range F-35 flight.

"The ferry flight went very smoothly, and reflects how the Air Force and Lockheed Martin will work cooperatively as we enter long-term F-35 testing at Edwards," Beesley said. During the jets' deployment to Edwards, the F-35s will undergo ground- and flight-test activities for propulsion, aerial refueling, logistical support, weapons integration and flight-envelope expansion.

"Through rigorous flight testing we are developing dominant and lethal 5th generation fighter capability for America and her allies," said Doug Pearson, Lockheed Martin vice president of F-35 test and verification. "This historic moment at Edwards Air Force Base begins the planned expansion of F-35 flight test to a third permanent operating location. Lockheed Martin F-35A flight testing is a highly integrated partnership with the United States Air Force." Three F-35s are currently undergoing flight trials at Naval Air Station Patuxent River, MD, the primary test site for the F-35B short takeoff/ vertical landing variant and the F-35C carrier variant. F-35s have conducted more than 200 test flights, with six additional test aircraft scheduled to begin flying and deploying to the two test sites this year.


File Photo

The F-35A conventional takeoff and landing (CTOL) variant - designed to meet U.S. Air Force requirements - is also the primary export version of the Lightning II. The air forces of Italy, the Netherlands, Turkey, Canada, Australia, Denmark and Norway will employ the F-35A.

FMI: www.lockheedmartin.com

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC