Two F-35 Fighters Arrive Together At Edwards AFB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, May 19, 2010

Two F-35 Fighters Arrive Together At Edwards AFB

Non-Stop Flight From Texas To California Signals Test Flight Expansion

Two F-35A Lightning II stealth fighters flew nonstop from their final-assembly site in Fort Worth, TX, to Edwards Air Force Base, CA, Monday, signaling a further expansion of F-35 flight test operations. The arrival is the first in a series that will increase the Edwards F-35 test fleet to at least eight aircraft.


File Photo

U.S. Air Force Test Pilot Lt. Col. Hank "Hog" Griffiths and Lockheed Martin Chief Test Pilot Jon Beesley flew the jets, known as AF-1 and AF-2, nonstop in the first multi-ship, long-range F-35 flight.

"The ferry flight went very smoothly, and reflects how the Air Force and Lockheed Martin will work cooperatively as we enter long-term F-35 testing at Edwards," Beesley said. During the jets' deployment to Edwards, the F-35s will undergo ground- and flight-test activities for propulsion, aerial refueling, logistical support, weapons integration and flight-envelope expansion.

"Through rigorous flight testing we are developing dominant and lethal 5th generation fighter capability for America and her allies," said Doug Pearson, Lockheed Martin vice president of F-35 test and verification. "This historic moment at Edwards Air Force Base begins the planned expansion of F-35 flight test to a third permanent operating location. Lockheed Martin F-35A flight testing is a highly integrated partnership with the United States Air Force." Three F-35s are currently undergoing flight trials at Naval Air Station Patuxent River, MD, the primary test site for the F-35B short takeoff/ vertical landing variant and the F-35C carrier variant. F-35s have conducted more than 200 test flights, with six additional test aircraft scheduled to begin flying and deploying to the two test sites this year.


File Photo

The F-35A conventional takeoff and landing (CTOL) variant - designed to meet U.S. Air Force requirements - is also the primary export version of the Lightning II. The air forces of Italy, the Netherlands, Turkey, Canada, Australia, Denmark and Norway will employ the F-35A.

FMI: www.lockheedmartin.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC