Two F-35 Fighters Arrive Together At Edwards AFB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.09.24

Airborne-NextGen-12.10.24

Airborne-Unlimited-12.11.24

Airborne AffordableFlyers-12.12.24

Airborne-Unlimited-12.13.24

Wed, May 19, 2010

Two F-35 Fighters Arrive Together At Edwards AFB

Non-Stop Flight From Texas To California Signals Test Flight Expansion

Two F-35A Lightning II stealth fighters flew nonstop from their final-assembly site in Fort Worth, TX, to Edwards Air Force Base, CA, Monday, signaling a further expansion of F-35 flight test operations. The arrival is the first in a series that will increase the Edwards F-35 test fleet to at least eight aircraft.


File Photo

U.S. Air Force Test Pilot Lt. Col. Hank "Hog" Griffiths and Lockheed Martin Chief Test Pilot Jon Beesley flew the jets, known as AF-1 and AF-2, nonstop in the first multi-ship, long-range F-35 flight.

"The ferry flight went very smoothly, and reflects how the Air Force and Lockheed Martin will work cooperatively as we enter long-term F-35 testing at Edwards," Beesley said. During the jets' deployment to Edwards, the F-35s will undergo ground- and flight-test activities for propulsion, aerial refueling, logistical support, weapons integration and flight-envelope expansion.

"Through rigorous flight testing we are developing dominant and lethal 5th generation fighter capability for America and her allies," said Doug Pearson, Lockheed Martin vice president of F-35 test and verification. "This historic moment at Edwards Air Force Base begins the planned expansion of F-35 flight test to a third permanent operating location. Lockheed Martin F-35A flight testing is a highly integrated partnership with the United States Air Force." Three F-35s are currently undergoing flight trials at Naval Air Station Patuxent River, MD, the primary test site for the F-35B short takeoff/ vertical landing variant and the F-35C carrier variant. F-35s have conducted more than 200 test flights, with six additional test aircraft scheduled to begin flying and deploying to the two test sites this year.


File Photo

The F-35A conventional takeoff and landing (CTOL) variant - designed to meet U.S. Air Force requirements - is also the primary export version of the Lightning II. The air forces of Italy, the Netherlands, Turkey, Canada, Australia, Denmark and Norway will employ the F-35A.

FMI: www.lockheedmartin.com

Advertisement

More News

Aero-News: Quote of the Day (12.10.24)

“We’re watching the very nature of warfare change. The speed of technology is absolutely meteoric.” Source: Maj. Gen. Clair Gill, commanding general of the Fort N>[...]

ANN's Daily Aero-Term (12.10.24): Handoff

Handoff An action taken to transfer the radar identification of an aircraft from one controller to another if the aircraft will enter the receiving controller's airspace and radio >[...]

ANN's Daily Aero-Linx (12.10.24)

Aero Linx: European Association of Aviation Training and Education Organizations – EATEO EATEO aspires to be the European voice for driving the best aviation training and edu>[...]

Aero-News: Quote of the Day (12.11.24)

“Think spacious modules with large windows to view Earth, our blue origin, while experiencing the thrill of weightlessness in complete comfort. Distinct quarters will be desi>[...]

ANN's Daily Aero-Term (12.11.24): Altitude Restriction

Altitude Restriction An altitude or altitudes, stated in the order flown, which are to be maintained until reaching a specific point or time. Altitude restrictions may be issued by>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC