HAV Awarded Production Organization Approval | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jan 10, 2019

HAV Awarded Production Organization Approval

POA A Significant Milestone Towards Production Launch

As 2018 came to a close, the Civil Aviation Authority (CAA) awarded Hybrid Air Vehicles Ltd a Production Organization Approval. Following the successful award of Design Organization Approval from EASA in October 2018, this latest achievement sees HAV starting 2019 in a strong position to launch production.

A Production Organisation Approval (POA) considers the manufacture and assembly aspects of aircraft production. This includes supply chain management, processes relating to manufacture and assembly, and the production facility itself. Both the Design Organization Approval (DOA), which covers design activities and flight test, and the POA, covering manufacture and assembly, are required to move forward into a type certification program with the production Airlander 10.

Being awarded the POA in 2018 is a remarkable achievement. It typically takes over a year to prepare a facility for a POA audit. HAV only moved into its production facility, the Airlander Technology Center, in June and were able to be audit-ready in under six months. This success is down to the effort of the Production team, led by Ivor Pope.

In addition to preparing the facility, the team at Technology House has been working to establish rigorous supply chain and quality assurance processes. “The POA approval is a significant milestone for HAV. It is the culmination of months of hard work and focused effort,” comments David Lindley, HAV’s Head of Aviation Safety & Quality Assurance. “It demonstrates that the safety, quality assurance, and supply chain management processes are in place, along with the production facility.”

“Successfully being awarded our POA in the same year as our DOA is fantastic,” adds Executive Director Nick Allman. “The POA is the regulator’s stamp of approval for us to move ahead with the (production) of Airlander 10 on the path to type certification. This puts us in a great position going into 2019.”

(Source: Hybrid Air Vehicles news release. Image from file)

FMI: www.hybridairvehicles.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC