Rep. Smith: Administration Requests Causing Space Exploration Delays | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Sep 05, 2014

Rep. Smith: Administration Requests Causing Space Exploration Delays

House Science Committee Chair Questions New Timeline For First SLS Launch

Science, Space, and Technology Committee Chairman Lamar Smith (R-TX) and Space Subcommittee Chairman Steven Palazzo (R-MS), recently sent a letter to NASA Administrator Charles F. Bolden, Jr. about reported delays to NASA’s Space Launch System (SLS) and Orion crew vehicle. The news comes despite congressional support above the Administration’s full budget requests and repeated Administration assurances that the exploration priorities are on schedule.

“I was alarmed to learn that the timeline for the Space Launch System (SLS) and Orion crew vehicle programs has shifted," Chairman Smith (pictured) said in the letter. "This news is contrary to numerous assurances from the Administration that these programs are on schedule. The House Science, Space, & Technology Committee has repeatedly committed to supporting these programs at or above the Administration’s request for a 2017 launch date. Now we are being told that date has changed to November 2018. This also calls into question the commitment of the Administration that has consistently reduced the budgets for these vital programs.

“I will continue doing everything in my power to ensure these programs remain on schedule and on budget. I urge the Administration to once more renew its commitment to our nation’s space exploration programs.”

NASA officials last week announced a launch readiness schedule based on an initial SLS flight no later than November 2018. This comes as a change to previous plans for a flight in 2017. A recent Government Accountability Office (GAO) report also found that, “the agency’s current funding plan for SLS may be $400 million short of what the program needs to launch by 2017.” The president’s most recent budget request for FY2015 reduced these programs by over $330 million compared to the FY2014 appropriation enacted by Congress. Had Congress agreed to the Administration’s original requests, NASA delays could have been even longer.

In June, the House passed the Committee’s NASA Authorization Act with full support for SLS and Orion following personal assurances from Administrator Bolden that“this is the amount of money that we need to deliver SLS on the date and time that we said.”

FMI: Full Letter

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC