Final Tranche 1 Typhoon Delivered To Core Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Mar 25, 2008

Final Tranche 1 Typhoon Delivered To Core Program

German Two-Seat Aircraft Last Of 144 Planes

With the handover of GT015, a German two-seat Eurofighter aircraft, the final aircraft out of Tranche 1 destined for the four partner Air Forces of Germany, Italy, Spain and the United Kingdom in the core program has been delivered on March 20, 2008.

"This delivery represents a major milestone in the core program. With 144 series production delivered (including five to Austria), the Air Forces are rapidly accumulating flying hours and gathering experience with the system," said Aloysius Rauen, Chief Executive Officer Eurofighter GmbH. "The nations already operate Eurofighter Typhoon in the air defence role. The Royal Air Force is preparing for the first multi-role task of Eurofighter Typhoon, deploying the system over long distances and training the air and ground crews for combat. And Austria, the first export customer, is planning to start operational air surveillance tasks with the upcoming European Soccer Championship. This is outstanding proof for the maturity of the system."

First deliveries to the four Air Forces began in Summer 2003. Eurofighter Typhoon officially entered into service with the Air Forces in Spring 2004. Italy was the first nation to operate Eurofighter Typhoon in the air defence role, beginning in 2005. Today, 10 units at six air bases fly the aircraft, and the fleet surpassed the 34,000 flying hour mark in March 2008.

"2008 is set to be a landmark year for the Eurofighter program. 38 aircraft of Tranche 2 are in final assembly with deliveries to start early summer," Rauen said. "Later this year, the work based on the Main Development Contract will be concluded, and the contract signature for Tranche 3 is envisaged between the nations and industry."

FMI: www.eurofighter.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC