Final Tranche 1 Typhoon Delivered To Core Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Mar 25, 2008

Final Tranche 1 Typhoon Delivered To Core Program

German Two-Seat Aircraft Last Of 144 Planes

With the handover of GT015, a German two-seat Eurofighter aircraft, the final aircraft out of Tranche 1 destined for the four partner Air Forces of Germany, Italy, Spain and the United Kingdom in the core program has been delivered on March 20, 2008.

"This delivery represents a major milestone in the core program. With 144 series production delivered (including five to Austria), the Air Forces are rapidly accumulating flying hours and gathering experience with the system," said Aloysius Rauen, Chief Executive Officer Eurofighter GmbH. "The nations already operate Eurofighter Typhoon in the air defence role. The Royal Air Force is preparing for the first multi-role task of Eurofighter Typhoon, deploying the system over long distances and training the air and ground crews for combat. And Austria, the first export customer, is planning to start operational air surveillance tasks with the upcoming European Soccer Championship. This is outstanding proof for the maturity of the system."

First deliveries to the four Air Forces began in Summer 2003. Eurofighter Typhoon officially entered into service with the Air Forces in Spring 2004. Italy was the first nation to operate Eurofighter Typhoon in the air defence role, beginning in 2005. Today, 10 units at six air bases fly the aircraft, and the fleet surpassed the 34,000 flying hour mark in March 2008.

"2008 is set to be a landmark year for the Eurofighter program. 38 aircraft of Tranche 2 are in final assembly with deliveries to start early summer," Rauen said. "Later this year, the work based on the Main Development Contract will be concluded, and the contract signature for Tranche 3 is envisaged between the nations and industry."

FMI: www.eurofighter.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC