Final Tranche 1 Typhoon Delivered To Core Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Mar 25, 2008

Final Tranche 1 Typhoon Delivered To Core Program

German Two-Seat Aircraft Last Of 144 Planes

With the handover of GT015, a German two-seat Eurofighter aircraft, the final aircraft out of Tranche 1 destined for the four partner Air Forces of Germany, Italy, Spain and the United Kingdom in the core program has been delivered on March 20, 2008.

"This delivery represents a major milestone in the core program. With 144 series production delivered (including five to Austria), the Air Forces are rapidly accumulating flying hours and gathering experience with the system," said Aloysius Rauen, Chief Executive Officer Eurofighter GmbH. "The nations already operate Eurofighter Typhoon in the air defence role. The Royal Air Force is preparing for the first multi-role task of Eurofighter Typhoon, deploying the system over long distances and training the air and ground crews for combat. And Austria, the first export customer, is planning to start operational air surveillance tasks with the upcoming European Soccer Championship. This is outstanding proof for the maturity of the system."

First deliveries to the four Air Forces began in Summer 2003. Eurofighter Typhoon officially entered into service with the Air Forces in Spring 2004. Italy was the first nation to operate Eurofighter Typhoon in the air defence role, beginning in 2005. Today, 10 units at six air bases fly the aircraft, and the fleet surpassed the 34,000 flying hour mark in March 2008.

"2008 is set to be a landmark year for the Eurofighter program. 38 aircraft of Tranche 2 are in final assembly with deliveries to start early summer," Rauen said. "Later this year, the work based on the Main Development Contract will be concluded, and the contract signature for Tranche 3 is envisaged between the nations and industry."

FMI: www.eurofighter.com

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC