Onboard Software Acted Appropriately And Initiated A Safe Shutdown Of The Engines
Teams from NASA’s Space Launch System (SLS) Program conducted a hot fire of the Artemis I core stage on Jan. 16 at NASA’s Stennis Space Center. What should have happened was this... Engine ignition should have started at approximately six tenths of a second before T-0, beginning with Engine 1, then Engines 3, 4, and 2 ignited in sequence a few hundredths of a second apart. The test was expected to last about 8 minutes and included three different power levels for the engines, as well as two 30-second engine gimballing, or pivoting, movements to simulate flight steering commands. Depending on the rate propellant is burned the time was estimated to range fr