NATA Teams With The University Of Maryland | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Fri, Jul 12, 2019

NATA Teams With The University Of Maryland

Will Tackle Foam Fire Suppression System Discharges In Aircraft Hangars

Last week, NATA and the University of Maryland signed a sponsored research agreement in an effort to review the causes, hazards, and associated costs of accidental discharges of foam fire suppression systems. The project will also address high-expansion and low-expansion foam systems, in addition to determining the rationale for the requirement of foam systems included in the National Fire Protection Association (NFPA) 409 for aircraft hangars.

“There is significant uncertainty surrounding the benefits versus potential hazards related to hangar foam fire suppression systems,” NATA president and CEO Gary Dempsey stated. “NATA members have repeatedly voiced concern that the cost of installing these foam systems dramatically increases the expense of new hangars, while providing limited risk mitigation due to the low incidence of hangar fires.”

Feedback from the industry indicates the risk of accidental discharge of these systems is high and such discharges include significant costs related to clean-up, aircraft damage, and possible environmental damage.

“NATA is very pleased to contract with the University of Maryland’s Department of Fire Protection Engineering and Dr. James Milke to collect and analyze existing data to address the industry’s questions. We believe that this analysis will confirm what our members have expressed – that the cost of installation, maintenance, and clean-up from false discharges far exceeds the risk reduction of these systems,” Dempsey added.

The revision cycle for the NFPA 409 standard is currently underway and NATA’s proposal and industry comments are due by November 14, 2019. The NFPA 409 Technical Committee will review industry comments and internal processes will occur during late 2019 through mid-2021. The next edition of NFPA 409 will be published in early 2021.

(Source: NATA news release)

FMI: www.nata.aero

Advertisement

More News

Airborne 10.06.25: FAA Furloughs, Airshows Hit By Shutdown, Livestream Accident

Also: Pilot Age Cap, Skylar AI Flight Assistant, NS-36 Mission, ALPA v Shutdown The federal government has officially gone into lockdown mode. The FAA will be laying off around a f>[...]

ANN's Daily Aero-Term (10.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

ANN's Daily Aero-Linx (10.10.25)

Aero Linx: The Society of United States Air Force Flight Surgeons (SoUSAFFS) Thank you for visiting the Society of United States Air Force Flight Surgeons (SoUSAFFS) web page. We a>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecnam P2006T

Postaccident Examination Of The Airplane Revealed That The Carburetor Heat Levers Remained In The OFF Position Analysis: The flight instructor and commercial pilot receiving multi->[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC