Engineers Still Discussing Discovery Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Nov 09, 2010

Engineers Still Discussing Discovery Repairs

GUPC, Crack In Foam Insulation Delaying Launch

Engineers met in a series of meetings Monday to discuss inspection and repair options for space shuttle Discovery's ground umbilical carrier plate (GUCP) and a crack in the external fuel tank foam insulation. Discovery's launch was postponed Friday until at least Nov. 30 because of a hydrogen gas leak at the GUCP.


NASA File Photo

Technicians at NASA's Kennedy Space Center in Florida have been measuring the alignment of the plate on the external tank and performing leak checks. Crews began disconnecting the GUCP Tuesday after disconnecting the hydrogen vent line that attaches to the GUCP. Managers will assess repair options after the disconnected GUCP is inspected.

Teams also have begun analysis and inspection of the approximately 20-inch long crack in the external tank foam. Teams are planning to use terahertz or backscatter scans to see beneath the foam to look for any other potential issues. As early as Wednesday, technicians could begin dissecting the cracked section so foam experts can make a thorough evaluation in order to help determine the cause of the crack. Teams still are working out plans to reapply foam to the external tank after inspections are complete. Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.


NASA File Photo

Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Extra Aircraft Announces the Extra 330SX

From 2023 (YouTube Edition): An Even Faster Rolling Extra! Jim Campbell joined General Manager of Extra Aircraft Duncan Koerbel at AirVenture 2023 to talk about what’s up and>[...]

Aero-News: Quote of the Day (11.15.25)

“Receiving our Permit to Fly and starting Phase 4 marks a defining moment for Vertical Aerospace. Our team has spent months verifying every core system under close regulatory>[...]

ANN's Daily Aero-Term (11.15.25): Middle Marker

Middle Marker A marker beacon that defines a point along the glideslope of an ILS normally located at or near the point of decision height (ILS Category I). It is keyed to transmit>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

Airborne 11.14.25: Last DC-8 Retires, Boeing Recovery, Teeny Trig TXP

Also: ATI Strike Prep, Spirit Still Troubled, New CubCrafters Dealership, A-29 Super Tucano Samaritan’s Purse is officially moving its historic Douglas DC-8 cargo jet into re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC