NASA's Space Launch System One Step Closer To 2017 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sun, May 25, 2014

NASA's Space Launch System One Step Closer To 2017 Flight

Test Demonstrates Key Structure's Max Load

NASA and ATK are one step closer to meeting a 2017 launch date for NASA's Space Launch System (SLS) after completion of a significant structural test of the booster's main attachment mechanism. NASA is developing SLS to take humans farther into deep space than ever before.

"We test like we fly," said Charlie Precourt, vice president and general manager of ATK's Space Launch Division, and former four-time space shuttle astronaut. "There are no second chances in spaceflight—we have to be certain we've got it right before we launch."

The article tested was a major load-bearing structure known as the forward skirt. The attach point on the forward skirt is where the main stage attaches to the five-segment solid rocket boosters that will launch SLS into deep space. ATK is providing the boosters as well as integration with the forward skirt.

The forward skirt is one of many critical components of the SLS booster design and must be tested to meet very demanding SLS requirements. For the test, ATK designed and fabricated a new test stand capable of applying millions of pounds of force to the structure.

Technicians tested the forward skirt at simulated lift-off and ascent conditions before testing it to failure. The final test demonstrated the structure's maximum load.

NASA's SLS booster program remains on track for a late 2017 launch. The booster critical design review will be held this summer.

(Image provided by ATK)

FMI: www.nasa.gov, www.atk.com

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC