NASA's Space Launch System One Step Closer To 2017 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sun, May 25, 2014

NASA's Space Launch System One Step Closer To 2017 Flight

Test Demonstrates Key Structure's Max Load

NASA and ATK are one step closer to meeting a 2017 launch date for NASA's Space Launch System (SLS) after completion of a significant structural test of the booster's main attachment mechanism. NASA is developing SLS to take humans farther into deep space than ever before.

"We test like we fly," said Charlie Precourt, vice president and general manager of ATK's Space Launch Division, and former four-time space shuttle astronaut. "There are no second chances in spaceflight—we have to be certain we've got it right before we launch."

The article tested was a major load-bearing structure known as the forward skirt. The attach point on the forward skirt is where the main stage attaches to the five-segment solid rocket boosters that will launch SLS into deep space. ATK is providing the boosters as well as integration with the forward skirt.

The forward skirt is one of many critical components of the SLS booster design and must be tested to meet very demanding SLS requirements. For the test, ATK designed and fabricated a new test stand capable of applying millions of pounds of force to the structure.

Technicians tested the forward skirt at simulated lift-off and ascent conditions before testing it to failure. The final test demonstrated the structure's maximum load.

NASA's SLS booster program remains on track for a late 2017 launch. The booster critical design review will be held this summer.

(Image provided by ATK)

FMI: www.nasa.gov, www.atk.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC