NASA's Space Launch System One Step Closer To 2017 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sun, May 25, 2014

NASA's Space Launch System One Step Closer To 2017 Flight

Test Demonstrates Key Structure's Max Load

NASA and ATK are one step closer to meeting a 2017 launch date for NASA's Space Launch System (SLS) after completion of a significant structural test of the booster's main attachment mechanism. NASA is developing SLS to take humans farther into deep space than ever before.

"We test like we fly," said Charlie Precourt, vice president and general manager of ATK's Space Launch Division, and former four-time space shuttle astronaut. "There are no second chances in spaceflight—we have to be certain we've got it right before we launch."

The article tested was a major load-bearing structure known as the forward skirt. The attach point on the forward skirt is where the main stage attaches to the five-segment solid rocket boosters that will launch SLS into deep space. ATK is providing the boosters as well as integration with the forward skirt.

The forward skirt is one of many critical components of the SLS booster design and must be tested to meet very demanding SLS requirements. For the test, ATK designed and fabricated a new test stand capable of applying millions of pounds of force to the structure.

Technicians tested the forward skirt at simulated lift-off and ascent conditions before testing it to failure. The final test demonstrated the structure's maximum load.

NASA's SLS booster program remains on track for a late 2017 launch. The booster critical design review will be held this summer.

(Image provided by ATK)

FMI: www.nasa.gov, www.atk.com

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC