New Launch Date For Endeavour Set | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Jun 15, 2009

New Launch Date For Endeavour Set

Go For Wednesday At 0540

NASA managers have scheduled the next launch attempt of space shuttle Endeavour's STS-127 mission for 5:40 a.m. EDT on Wednesday, June 17.

Endeavour's planned June 13 liftoff was postponed because of a leak associated with the gaseous hydrogen venting system outside the shuttle's external fuel tank. The system is used to carry excess hydrogen safely away from the launch pad. That repair has been completed 

As a result, the Lunar Reconnaissance Orbiter, or LRO, and Lunar Crater Observation and Sensing Satellite, or LCROSS, are set to lift off together aboard an Atlas V rocket on Thursday, June 18. That launch pushed back a day to accommodate Endeavour's June 17 liftoff.

The leak postponed Endeavour's Saturday morning scheduled launch to the International Space Station. Teams on Kennedy's Launch Pad 39A have changed out internal seals in the Ground Umbilical Carrier Plate, or GUCP, which is attached to the external tank. The vent line runs from the GUCP, away from the launch pad to a "flare stack" where excess hydrogen is safely burned off.

Endeavour's leak was similar to what happened during the first launch attempt of space shuttle Discovery's STS-119 mission in March. Technicians are using the same repair method, which led to Discovery's successful launch on its next attempt

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC