New Launch Date For Endeavour Set | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Jun 15, 2009

New Launch Date For Endeavour Set

Go For Wednesday At 0540

NASA managers have scheduled the next launch attempt of space shuttle Endeavour's STS-127 mission for 5:40 a.m. EDT on Wednesday, June 17.

Endeavour's planned June 13 liftoff was postponed because of a leak associated with the gaseous hydrogen venting system outside the shuttle's external fuel tank. The system is used to carry excess hydrogen safely away from the launch pad. That repair has been completed 

As a result, the Lunar Reconnaissance Orbiter, or LRO, and Lunar Crater Observation and Sensing Satellite, or LCROSS, are set to lift off together aboard an Atlas V rocket on Thursday, June 18. That launch pushed back a day to accommodate Endeavour's June 17 liftoff.

The leak postponed Endeavour's Saturday morning scheduled launch to the International Space Station. Teams on Kennedy's Launch Pad 39A have changed out internal seals in the Ground Umbilical Carrier Plate, or GUCP, which is attached to the external tank. The vent line runs from the GUCP, away from the launch pad to a "flare stack" where excess hydrogen is safely burned off.

Endeavour's leak was similar to what happened during the first launch attempt of space shuttle Discovery's STS-119 mission in March. Technicians are using the same repair method, which led to Discovery's successful launch on its next attempt

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC