UK Plant Rolls Out 'Century' Typhoon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sun, May 29, 2011

UK Plant Rolls Out 'Century' Typhoon

One Hundredth Aircraft Comes Off The Warton In Lancanshire Line

The 100th Typhoon aircraft built in the UK's final assembly facility at Warton in Lancashire has come off the assembly line.

As part of the Eurofighter Typhoon consortium BAE Systems is responsible for the production of key aircraft parts including the front fuselage, foreplanes, windscreen and canopy as well as carrying out the final assembly of all UK Typhoons. The design, development and manufacture of Typhoon sustains more than 100,000 jobs in 400 companies across Europe.

"We're delighted to have achieved this major milestone," said Tom Fillingham, BAE Systems Aircraft Programs Director. "Together with the UK MOD and the RAF, we continue our commitment to enhance and upgrade the aircraft's capabilities. This work known as the Typhoon Future Capability Upgrade programme is vital to the future success of the aircraft both in the UK and for current and potential customers worldwide."

Gary Moore from Defence Equipment and Support MOD accepted the aircraft on behalf of the RAF. He said: "I'm very proud to be accepting the 100th Typhoon. I've worked on the program for over fourteen years including design and development to acceptance of the first twin seat production aircraft back in 2003."

FMI: www.baesystems.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC