New Launch Date For Endeavour Set | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Jun 15, 2009

New Launch Date For Endeavour Set

Go For Wednesday At 0540

NASA managers have scheduled the next launch attempt of space shuttle Endeavour's STS-127 mission for 5:40 a.m. EDT on Wednesday, June 17.

Endeavour's planned June 13 liftoff was postponed because of a leak associated with the gaseous hydrogen venting system outside the shuttle's external fuel tank. The system is used to carry excess hydrogen safely away from the launch pad. That repair has been completed 

As a result, the Lunar Reconnaissance Orbiter, or LRO, and Lunar Crater Observation and Sensing Satellite, or LCROSS, are set to lift off together aboard an Atlas V rocket on Thursday, June 18. That launch pushed back a day to accommodate Endeavour's June 17 liftoff.

The leak postponed Endeavour's Saturday morning scheduled launch to the International Space Station. Teams on Kennedy's Launch Pad 39A have changed out internal seals in the Ground Umbilical Carrier Plate, or GUCP, which is attached to the external tank. The vent line runs from the GUCP, away from the launch pad to a "flare stack" where excess hydrogen is safely burned off.

Endeavour's leak was similar to what happened during the first launch attempt of space shuttle Discovery's STS-119 mission in March. Technicians are using the same repair method, which led to Discovery's successful launch on its next attempt

FMI: www.nasa.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC