Final assembly of the first A350 XWB is now underway at the brand new final assembly line in Toulouse. This latest step in the A350 XWB’s progress is achieved as Airbus starts joining the 64 foot long center fuselage with the 69 foot long front fuselage. This first A350 XWB airframe will be used for the static structural tests that all new aircraft undergo as part of their certification process. The assembly of the first flying A350 XWB, MSN1, will start during summer.
The center fuselage was delivered to Toulouse on Wednesday 4th April 2012 by Beluga from Airbus in St Nazaire, France. The front fuselage was previously delivered from St Nazaire to the A350 XWB final assembly line on the 23rd December 2011. Delivery and installation of the aft fuselage from Hamburg, Germany will take place in the coming weeks, followed by the wings delivered from Airbus’ wing assembly site in Broughton, UK.
The A350 XWB fuselage is made up of three main sections - front, center and aft. These will be joined together at the first main assembly station, Station 50. The nose landing-gear is also joined here. Once this stage is completed, the fuselage is transferred to Station 40 where the wings and tail sections are joined. In parallel to this, cabin installation will be carried out simultaneously to the wing-fuselage join up, as well as the “power on” of the aircraft systems. In this way, functional tests can start earlier than on previous programs.
Over 70 percent of the A350 XWB’s weight-efficient airframe is made from advanced materials combining composites (53 percent), titanium and advanced aluminum alloys. The aircraft’s innovative all-new Carbon Fiber Reinforced Plastic (CFRP) fuselage results in lower fuel burn as well as easier maintenance. The A350 XWB benefits from Airbus’ high level of expertise in incorporating composite material into its aircraft. (Image provided by Airbus)
Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]
Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]
"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]
(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]
“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]