ANA 'Disappointed' In Dreamliner Delivery Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Nov 30, 2010

ANA 'Disappointed' In Dreamliner Delivery Schedule

Launch Customer Has Ordered 55 Of The New Airliners

All Nippon Airways (ANA) CEO Shinichiro Ito said Monday that his airline is "pushing" Boeing for a new delivery schedule for its long-delayed 787 Dreamliner. The aircraft suffered another delay in November when a fire in an electrical panel forced a halt to flight testing of the aircraft.


Flight Test Dreamliner In ANA Livery

Ito said the airline was also insisting on a "detailed cause of the irregularities," according to a report from the French news service AFP. ANA was scheduled to receive its first Dreamliner two years ago, but Boeing had recently revised its first deliveries into 2011 before the issue with the electrical panel.

ANA has had to re-structure its plans to retire older aircraft as the delivery date continues to slip. Still, Ito said he has no regrets about placing a large order for the jets. "It's a dream," he told the service. He said the airlines' top priority is "an excellent fleet."

FMI: www.boeing.com. www.ana.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC