SpaceX Ready To Try Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Feb 09, 2006

SpaceX Ready To Try Again

Launch Attempt Scheduled For Friday

They're checking... double checking... and TRIPLE checking on Omalek, as SpaceX readies its Falcon 1 launch vehicle for its first flight once again. A full-scale test of vehicle systems, including initiating the flight countdown auto sequence and even briefly firing the main engine on the launch stand, is scheduled to take place Thursday, February 9.

If no flight critical anomalies are detected, SpaceX says the actual launch will take place on Friday, February 10. The launch window on Friday is 12pm - 7 pm, Pacific Standard Time.

When we last left SpaceX, the company was forced to scrub its December 19 launch attempt due to the failure of an electronic component in one of the first stage fuel tank pressurization valves. Even the booster's triple-redundant pressure sensors were unable to stop the failure from scrubbing the mission, as when this component shorted, it caused the valve controller board to reboot -- effectively eliminating the redundancy.

The company notes on its website it was the first time 3.5 years of hard testing that they had ever seen such a failure occur. Moreover, the component in question has a cycle life and power rating far in excess of the theoretical load that it should see. 

To address that specific problem, SpaceX replaced the component with one that has a "quasi-infinite" lifespan. The company is also taking steps that will isolate any issue with this component should it go screwy in the future.

The company also shipped a new first stage to Hawaii via C-5 Galaxy, where it arrived just in time to catch the barge from there to Omalek a few days before New Year's Eve.

SpaceX was discouraged, of course, by the delays -- but not downtrodden.

"Those familiar with the launch business will know that countdown scrubs are a way of life," said company founder Elon Musk. "It's often said that the safest time to schedule your vacation is around launch day and that's true more often than not. Even rockets that have launched hundreds of times from launch pads that are in heavy use have multiple scrubs."

"Not too long ago, there was a Titan launch that had eleven scrubs and Delta launch that had six," Musk pointedly writes on the SpaceX website.

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC