Another Presidential Test Helicopter Takes to the Air | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Mar 03, 2008

Another Presidential Test Helicopter Takes to the Air

Test Vehicle 3, the third helicopter built for the VH-71 Presidential Helicopter Replacement Program, made its initial flight Feb. 27 in Yeovil, England marking the fourth helicopter to enter flight test.

TV-3 is due to arrive at the Presidential Helicopter Support Facility here on Mar. 17 and will then travel to Lockheed Martin Systems Integration in Owego, N.Y. for final assembly and mission systems integration. TV-3 will be the first vehicle tested that is outfitted with mission systems.

Once missionized TV-3 will join the other three test vehicles, TV-1, TV-2 and TV-5 already in flight testing that have accumulated more than 650 total hours of flight test.

As a missionized aircraft, TV-3 will be able to validate in-flight data, which has previously only been evaluated in laboratories. One additional test vehicle is scheduled for flight testing and missionization after TV-3 before the initial lot of production aircraft are delivered to Patuxent River.

With fuel system testing already complete, VH-71 flight test officials are currently concentrating on satellite communications and high-powered FM Radio testing with tail rotor and flight load survey testing on the horizon.

In addition to forward movement on flight testing of Increment 1 test vehicles, which currently meet or exceed all key performance parameters, a parallel and concurrent effort supporting the flight test program is the Systems Integration Lab currently operational at the Presidential Helicopter Support Facility.

The SIL consists of test benches used to evaluate individual subsystems currently in development. A larger SIL facility at Lockheed Martin Systems Integration in Owego, NY includes a master systems bench -- a full-scale functional mockup of the VH-71 cockpit and cabin. The systems integration laboratories allow VH-71 program engineers to test VH-71 avionics and mission systems prior to installation aboard the aircraft.

FMI: www.navair.mil

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC