ISS Spacewalk To Repair Cooling System Moved To Saturday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Aug 06, 2010

ISS Spacewalk To Repair Cooling System Moved To Saturday

Second EVA Scheduled For August 11 To Complete Repairs

The first of two spacewalks by NASA astronauts to replace a failed ammonia pump on the International Space Station has been moved to Saturday, August 7. A second spacewalk is planned for Wednesday, August 11, to complete the repairs.

Teams of flight controllers, engineers, and spacewalk experts have made significant progress in preparing for the first spacewalk, but need an additional day to get ready. The additional time allows for final procedures to be sent late Thursday to the station, giving the crew a full day to review the plans developed by Mission Control.

Managers also moved the second spacewalk to Wednesday to give the crew more time to rest and prepare.

Expedition 24 Flight Engineers Doug Wheelock and Tracy Caldwell Dyson are scheduled to perform the spacewalks, which are both scheduled to begin at 6:55 a.m. Saturday's spacewalk will be the fourth for Wheelock and the first for Caldwell Dyson.


(L-R) Tracy Caldwell Dyson, Doug Wheelock

Engineers and flight controllers continue to review data on the July 31 pump failure, which caused the loss of one of two cooling loops aboard the station. This failure resulted in a power down and required adjustments to maintain as much redundancy as possible for the station systems. The systems are stable, and the station's six crew members are not in any danger.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC