Building Homebuilders' Headquarters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jun 25, 2004

Building Homebuilders' Headquarters

One More Sign That AirVenture Is Upon Us

Work nears completion at the new EAA Homebuilders Headquarters at EAA AirVenture. Located on Wittman Road, the new HQ is considerably larger than the previous building, including a spacious registration area and store stocked with the latest homebuilding reference books and videos. An outside shelter/porch faces the flight line and can be used rain or shine.

Homebuilders also have a new camping area this year, located north of the Fly Market and west of Knapp Street, just a short walk from the forum and workshop areas. For those familiar with the Homebuilt flight line the camping area is immediately West of where the Van's RV aircraft are parked.

The campsites have room for about 100 under-the-wing campers and their aircraft. As with other EAA camping areas, there is no pre-registration; spaces are available on a first come, first served basis. Simply follow the instructions printed in the AirVenture NOTAM by having a sign with block letters HBC visible on the left side of your windshield indicating that you want to go to Homebuilt Camping.

FMI: www.eaa.org

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC