UAV Package Delivery Not Far Off | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Wed, Jan 22, 2003

UAV Package Delivery Not Far Off

First Test Successful

Northrop Grumman Corporation's Integrated Systems sector has conducted the first flight demonstration of an unmanned air vehicle (UAV) system designed to employ a fully-autonomous UAV to deliver a variety of payload packages to multiple, preprogrammed locations.

Developed and demonstrated within an eight-week period, the system is derived from the highly successful, reliable BQM-34 Firebee aerial target. The 36-minute flight, conducted Dec. 20, 2002, at an undisclosed Department of Defense test range, demonstrated autonomous navigation, payload carriage and payload deployment followed by successful recovery of the air vehicle.

"This project demonstrated both the versatility of the BQM-34 airframe and the fast reaction development capability in place at the company's Unmanned Systems facility in San Diego," said Al Nikolaus, Northrop Grumman's Firebee program manager.

"This was a team effort, integrating Firebee parts from all three military services built over a period of 30 years plus newly manufactured parts and modern, autonomous navigation systems," said Doug Fronius, Northrop Grumman's director for Targets programs.

The project was developed at the Integrated Systems sector's Unmanned Systems unit in San Diego. System modifications included integrating 1970s-era AQM-34L bomb rack-equipped wings with BQM-34S Firebee targets currently produced. Large composite payload pods manufactured for Northrop Grumman by Grove Aircraft (El Cajon, CA) were designed and integrated onto the air vehicle. In addition, a portable range safety flight termination system was integrated to allow system testing at a non-target test range facility.

Software was modified to provide fully autonomous mission capability, payload deployment and ground control station integration. Finally, the system was tested "end to end" at the program's system integration center facility.

FMI: www.northropgrumman.com

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC