Friday Shuttle Launch Is 'Go' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, May 13, 2010

Friday Shuttle Launch Is 'Go'

NASA Flight Directors Give The Green Light To Final Scheduled Atlantis Flight

Wednesday was "L-2" at NASA's Kennedy Space Center in Florida, as the shuttle and crew prepare for STS-132. Countdown clocks across the launch complex were activated at 1600 EDT Tuesday and the countdown continues on schedule for liftoff Friday at 1420.

During the 12-day mission, Atlantis and the mission's six astronauts are delivering an Integrated Cargo Carrier and a Russian-built Mini Research Module to the International Space Station.

"From a Space Shuttle Program and ISS Program standpoint, we're ready to launch Atlantis and get this mission under way," said Mike Moses, chair of the prelaunch mission management team that gathered today at Kennedy and gave a unanimous "go" for liftoff. According to Launch Director Mike Leinbach, the launch team is not tracking any issues that would prevent an on-time liftoff.

Atlantis' astronauts are relaxing today while technicians at Launch Pad 39A load the orbiter's power reactant and storage distribution system, which supplies super-cold propellants to the vehicle's three fuel cells and life-support system during flight.

A high-pressure system continues to dominate Florida's weather pattern, resulting in favorable weather for the rest of the week. The primary launch weather concern is a low cloud ceiling, but the forecast is good overall, calling for a 70 percent chance of favorable conditions at launch time.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC