Report: Ohio Airport Doesn't Meet FAA Standards | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Nov 25, 2008

Report: Ohio Airport Doesn't Meet FAA Standards

More Money Needed After $2.3 Million Investment

Ohio's Warren County Board of Commissioners has been hustling to bring the local airport into compliance with FAA standards, but it may have lost a race with a recession.

The Cincinnati Enquirer reports about $2.3 million has been spent in the last two years to clear trees and demolish buildings that lie within what should be the buffer zone for runway 1/19 at Warren County Airport (I68) near Lebanon.

Because of inattention to zoning laws, development has encroached on the airport. Many of the buildings were reportedly built without permits.

As a result, night landings became "really a thrill," to quote local pilot and Airport Authority President Bill Simmons. The runway is equipped with four-light precision approach path indicators, but Simmons notes, "...you wouldn't see the trees until you picked them up in your landing lights."

The FAA is willing to reimburse the county up to 95 percent for the required improvements if they're completed on schedule. Simmons says about 70 percent of the work is complete. The airport has asked for another $1.9 million in the 2009 budget to finish the job, but the county, like most, faces intense budgetary pressures in the recession.

Commissioners are expected late this month to approve a final 2009 budget calling for the smallest increase in spending in more than a decade.

County Commissioner Pat South says,"We hope the FAA will recognize that we are proactively going after this, but because of the circumstances of the economy, some things might take longer than we'd like."

FMI: www.warrencountyairport.com/

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC