Final Assembly Begins On Second 787 Flight Test Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Feb 16, 2008

Final Assembly Begins On Second 787 Flight Test Aircraft

First Plane Slated To Fly In Coming Months

Even as final checks are underway to ready the first airplane for its maiden flight, Boeing announced Friday that final assembly has begun on the second 787 Dreamliner flight-test airplane.

Loaded snugly into the first position of the 787 production system, workers in the Everett, WA-based factory can now begin joining together the fuselage sections and wings. All major joins take place in this position.

While this is the second of six flight-test airplanes, this Dreamliner is actually the fourth on the production line. It follows the two airplanes that will be used for static and fatigue testing.

Perhaps most important of all, Boeing notes vendors have improved the quality of the parts shipped to Everett for assembly -- a major sticking point on the first plane, and a large reason why that aircraft still hasn't taken to the air.

"We've received significantly less 'traveled work' on this airplane," said Steve Westby, vice president of 787 Final Assembly and Change Incorporation. "The degree of completeness of sections at the partners is significantly better than Airplane #1. Condition of assembly is much better and we will see continued improvements on the condition of each assembly shipped. All this helps to bring us back into alignment with the original design of our production system."

Boeing adds production is going well on subsequent airplanes, too, with 21 airplanes currently in various stages of production. This number includes the static and fatigue airplanes, which will not be delivered to customers.

Since its launch in April 2004, the 787 Dreamliner has amassed 857 firm orders valued at $144 billion from 56 airlines. The first 787 is slated to take flight by the end of June... close to one year after the aircraft was rolled out.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC