Final Assembly Begins On Second 787 Flight Test Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Feb 16, 2008

Final Assembly Begins On Second 787 Flight Test Aircraft

First Plane Slated To Fly In Coming Months

Even as final checks are underway to ready the first airplane for its maiden flight, Boeing announced Friday that final assembly has begun on the second 787 Dreamliner flight-test airplane.

Loaded snugly into the first position of the 787 production system, workers in the Everett, WA-based factory can now begin joining together the fuselage sections and wings. All major joins take place in this position.

While this is the second of six flight-test airplanes, this Dreamliner is actually the fourth on the production line. It follows the two airplanes that will be used for static and fatigue testing.

Perhaps most important of all, Boeing notes vendors have improved the quality of the parts shipped to Everett for assembly -- a major sticking point on the first plane, and a large reason why that aircraft still hasn't taken to the air.

"We've received significantly less 'traveled work' on this airplane," said Steve Westby, vice president of 787 Final Assembly and Change Incorporation. "The degree of completeness of sections at the partners is significantly better than Airplane #1. Condition of assembly is much better and we will see continued improvements on the condition of each assembly shipped. All this helps to bring us back into alignment with the original design of our production system."

Boeing adds production is going well on subsequent airplanes, too, with 21 airplanes currently in various stages of production. This number includes the static and fatigue airplanes, which will not be delivered to customers.

Since its launch in April 2004, the 787 Dreamliner has amassed 857 firm orders valued at $144 billion from 56 airlines. The first 787 is slated to take flight by the end of June... close to one year after the aircraft was rolled out.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC