Airbus Installs RR Trent XWB Engines, Honeywell APU On A350 XWB MSN001 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Mar 27, 2013

Airbus Installs RR Trent XWB Engines, Honeywell APU On A350 XWB MSN001

Makes MSN0001 A 'Completed Airplane'

Airbus has installed on the first flight-test A350 XWB (MSN001) its two flight-ready Rolls-Royce Trent XWB engines and is also installing the new Honeywell HGT1700 auxiliary power unit (APU) at Airbus’ production facilities in Toulouse (France).

The new Trent engines were both received from UTC Aerospace Systems (formerly Goodrich) which had recently prepared the fully integrated powerplants prior to their installation on the aircraft’s pylons. Last month the Trent XWB received Engine Type Certification from EASA, confirming that the engine had fulfilled EASA’s airworthiness requirements for flight. The Trent XWB has already powered a series of test flights on Airbus’ A380 Flying Test Bed (FTB) aircraft since February 2012, demonstrating a high level of maturity.
 
In parallel to the mounting of the two Trent XWB engines in Toulouse, the A350 XWB is also this week being fitted with its new specially developed APU – the Honeywell HGT1700 which has greater power density and higher efficiency than the previous generation APUs.
 
With the installation of its engines and also the APU, the A350 XWB MSN001 becomes essentially a ‘completed’ aircraft. Following the ongoing ground tests, other preparations and also painting in the coming weeks, MSN001 will then be handed over to the Airbus Flight Test team to commence preparations for ground runs and maiden flight in the summer.

(Images provided by Airbus)

FMI: www.airbus.com


Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC