NASA Appoints Board To Investigate Shuttle Arm Incident | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Sat, Mar 18, 2006

NASA Appoints Board To Investigate Shuttle Arm Incident

NASA has formed a board at the agency's Kennedy Space Center, Fla., to investigate the March 4 incident that damaged Space Shuttle Discovery's remote manipulator system (shuttle arm).

Hugo Delgado is chairman of the five-member investigation board. He is deputy director for the Office of the Chief Engineer at Kennedy. The board is supported by one ex-officio member, four advisors and administrative personnel.

Board functions include investigating the facts surrounding the incident, determining its probable cause, assessing the possibility of a recurrence and recommending corrective actions.

A final report is expected this summer.

One Inch Dent

On March 4 at about 10:10 p.m. EST, shuttle technicians inside a bridge bucket work platform device accidentally bumped into Discovery's robotic arm. The arm is a 50-foot-long, jointed extension used to grapple payloads, remove them from the payload bay and move spacewalking astronauts to various work platforms.

Inspections showed two indentations in the arm's outer bumper layer, a Kevlar-covered plastic, honeycombed structure designed to protect the arm from minor impacts. One of the indentations in the honeycombed layer is oval shaped, 0.115 inch deep and 1 inch in diameter.

The second indentation, also oval shaped, is 0.035 inch deep and 0.5 inch in diameter. Ultrasound inspections were performed once the Kevlar and honeycombed layer were removed.

Under the largest indentation was a small crack in the carbon-fiber composite, measuring 1.25 inches long and 0.015 inches deep. The arm was removed from the vehicle on Tuesday and will be sent back to the vendor for repair.

The shuttle is in Kennedy's Orbiter Processing Facility bay 3. It is undergoing preparations for the STS-121 mission to the International Space Station. The launch is targeted for no earlier than July 1.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC