Runway Closed For Repairs At São Paulo/Guarulhos International Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Aug 21, 2007

Runway Closed For Repairs At São Paulo/Guarulhos International Airport

New Surface Will Have Grooves To Prevent Water Accumulation

Brazilian airport operator Infraero closed the main runway at the country's largest international airport for repairs to improve safety.

According to Bloomberg, the runway will be closed at São Paulo/Guarulhos International Airport for about two months while re-paving is completed.

The Brazilian government is still under pressure to improve its air traffic and airport system compounded by the country's worst air disaster July 17. As ANN reported, a TAM A320 overran a rain-slick runway at Congonhas Airport upon landing and 199 people were killed.

That accident is speculated to have been caused, in part, by water that had accumulated on the runway. The improved GRU runway will have grooves to prevent water accumulation.

Since the TAM Airlines disaster, aircraft has been diverted to Guarulhos, Sao Paulo's domestic airport. Planes will use the secondary runway at GRU, located about 15 miles from downtown Sao Paulo, until construction is completed.

The target date for completion of the $6.4 million project is October 10.

FMI: www.infraero.gov.br

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC