Bombardier’s Begins Construction On CSeries Aircraft Wing Manufacturing Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Nov 18, 2009

Bombardier’s Begins Construction On CSeries Aircraft Wing Manufacturing Facility

Hi-Tech Plant Is Near Belfast In Northern Ireland

Bombardier Aerospace today celebrated another major milestone in the CSeries aircraft program as construction got under way on its new state-of-the-art aircraft wing manufacturing and assembly facility in Belfast, Northern Ireland.

“This is another significant milestone in the ongoing development of the CSeries aircraft program. In August, the test fuselage barrel arrived ahead of schedule at our St-Laurent, Québec site, from China, and in September we celebrated the groundbreaking of our first CSeries aircraft manufacturing building in Mirabel, Québec. The CSeries aircraft program is progressing well and to schedule, and we look forward to receiving the first test wing from Belfast in 2011,” said Guy Hachey, President and Chief Operating Officer, Bombardier Aerospace.

The new 600,000 sq ft factory is being built in two phases and will incorporate an existing production building. The facility’s design and layout are being optimized both for the production process and to minimize environmental impact. The structure will ensure maximum energy efficiency, and will incorporate low energy solutions into its mechanical and electrical infrastructure. Waste management was also a key consideration in the design, with a particular focus being given to waste segregation and recycling.

Joining Michael Ryan, Vice President and General Manager, Bombardier Aerospace, Belfast to lay a special corner stone to mark the construction was Northern Ireland Enterprise Minister Arlene Foster, along with guests including contractors. “We are delighted to mark this major investment in a new facility for the production of advanced composite aircraft wings. The CSeries aircraft program will help to build on our track record of almost 40 years experience in composites technology. We are currently testing and proving out the design, manufacturing and assembly processes for the CSeries aircraft wing. We are making excellent progress and are very pleased with the results so far,” said Michael Ryan.

“Just over a year ago, the CSeries aircraft project was announced. Today we have laid the cornerstone for a state-of-the-art manufacturing facility. This is a 20-year program which will generate around 800 high quality jobs at Bombardier Belfast in addition to the many employment opportunities during the build phase for the local construction sector during the current downturn,” declared Enterprise Minister Arlene Foster.

Bombardier C300

“Locating the CSeries aircraft wing project in Northern Ireland is a clear endorsement of the expertise and skill which exists in our aerospace sector and highlights our international reputation for excellence. As this project develops, I hope that there will be further opportunities for Bombardier and Invest Northern Ireland to strengthen the Northern Ireland aerospace industry,” she added.

Bombardier Belfast has successfully assembled a pre-production demonstrator wing using its innovative Resin Transfer Infusion advanced composites process, and is on track to begin testing this in early 2010. Testing will be undertaken in a specialized test rig where hydraulic jacks will be used to induce bending and twisting into the wing structure, replicating every possible combination of severe loading that the wing may experience in service.

FMI: www.bombardier.com

Advertisement

More News

Classic Aero-TV: Extra Aircraft Announces the Extra 330SX

From 2023 (YouTube Edition): An Even Faster Rolling Extra! Jim Campbell joined General Manager of Extra Aircraft Duncan Koerbel at AirVenture 2023 to talk about what’s up and>[...]

Aero-News: Quote of the Day (11.15.25)

“Receiving our Permit to Fly and starting Phase 4 marks a defining moment for Vertical Aerospace. Our team has spent months verifying every core system under close regulatory>[...]

ANN's Daily Aero-Term (11.15.25): Middle Marker

Middle Marker A marker beacon that defines a point along the glideslope of an ILS normally located at or near the point of decision height (ILS Category I). It is keyed to transmit>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

Airborne 11.14.25: Last DC-8 Retires, Boeing Recovery, Teeny Trig TXP

Also: ATI Strike Prep, Spirit Still Troubled, New CubCrafters Dealership, A-29 Super Tucano Samaritan’s Purse is officially moving its historic Douglas DC-8 cargo jet into re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC