Report: Boeing Production Cutbacks Will Mean More Job Cuts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Apr 10, 2009

Report: Boeing Production Cutbacks Will Mean More Job Cuts

Suppliers Could Start Feeling Affects This Year

Boeing's announcement Thursday it would slash 2010 production rates on its largest -- and most profitable -- airliners didn't come as much of a surprise for industry watchers.. and its likely ramifications won't surprise many, either.

The Seattle Times reports those cutbacks will lead to further job losses at Boeing's widebody production facility in Everett, WA by the middle of next year. Workers at facilities supplying parts for those aircraft could start laying off employees by the end of this year, as the planemaker trims its needed parts numbers to produce fewer aircraft.

In an interview with the Times, Boeing spokesman Jim Proulx said the planemaker expects the slowdown to bring "employment reductions beyond those already announced," though he didn't talk numbers.

Already in 2009, Boeing has announced plans to cut 4,500 workers from its commercial airplane division, and as many as 10,000 jobs company-wide. Those earlier cuts weren't tied to reductions in production output.

Boeing employees approximately 28,000 workers at Everett, according to the Times. Hopes that some job losses could be curbed by increased work on the upcoming 787 Dreamliner appear unlikely, as well.

An executive at one Boeing supplier for the 787 program said Boeing no longer plans an aggressive ramp-up once the composite-bodied airliner is certified, due to expected delivery deferrals and outright cancellations due to the sluggish economy.

"Rather than ramping up, the (787 suppliers) are really slowing things down," the executive said.

Boeing has received 32 order cancellations so far in 2009, all for the oft-delayed Dreamliner.

FMI: www.boeing.com

Advertisement

More News

Airborne 07.02.25: TikToker Arrested, Vietnam A/L Ground Hit, ATC Modernization

Also: Outlaw Prop 4 Mooney, Ready 4 Duty, Ukrainian F-16 Pilot Lost, Blue Origin Flt On his journey to become the first pilot to land solo on all seven continents, 19-year-old Etha>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

ANN's Daily Aero-Term (07.07.25): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

ANN's Daily Aero-Linx (07.07.25)

Aero Linx: Formation and Safety Team (F.A.S.T.), USA The Formation and Safety Team (FAST) is a worldwide, educational organization dedicated to teaching safe formation flying in Wa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC