Spaceship Orion Takes Its First Voyage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Nov 27, 2019

Spaceship Orion Takes Its First Voyage

Loaded Onto A Super Guppy Aircraft To Travel From Florida To Ohio

The Orion spaceship took off on board a Super Guppy aircraft from the Kennedy Space Center on Sunday, November 24: destination the world’s largest thermal vacuum chamber, owned by NASA. This is where the hot test phase of several months will begin for the spacecraft. The Super Guppy landed at Mansfield, Ohio. The transfer to Plum Brook Station in Sandusky, Ohio, took place Tuesday, November 26th.

A team of engineers and technicians from Airbus, the European Space Agency (ESA), Lockheed Martin and NASA are ready to put the spacecraft through simulations of extreme space conditions. "With the tests, we will show that the spacecraft's systems work as planned and at the same time ensure safe operation for the astronauts on future missions - both on the ground and on board," says Matthias Gronowski, Chief Engineer for the European Service Module that Airbus is building for NASA on behalf of  ESA.  

The tests will be conducted in two phases in the world's largest vacuum chamber at NASA's Glenn Test Center in Plum Brook, Ohio. First there will be a 63-day thermal test. Orion's electrical systems will be switched on and operated under vacuum and in temperatures which simulate the environmental conditions in space. During this phase, the spacecraft will be exposed to extreme temperatures from about minus 115 to plus 75 degrees Celsius to reproduce the conditions the spacecraft will be exposed to, when in direct sunlight and in shadow in space.

The second phase is an electromagnetic compatibility test, which lasts about 14 days. Each electronic component emits a kind of electromagnetic field that can affect the performance of other nearby electronics. These tests ensure that the spacecraft's electronics function properly while operating. "This is a very important milestone for the journey to the Moon," says Gronowski. "The international team has been working towards this goal for three years now, and in recent months we have mechanically and electrically connected the Crew Module (astronaut capsule) and the European Service Module at Kennedy Space Center. What matters now is that we can show that the service module works under the extreme conditions of space," Gronowski continues.

After successful testing, Orion will return to NASA's Kennedy Space Center, where further tests and preparations for integration with the new Space Launch System (SLS) rocket will start before the launch of Artemis I at the end of 2020.

ESA's European Service Module will provide propulsion, power, air and water for the astronauts, as well as thermal control of the entire spacecraft. The first launch - without astronauts - is planned for the end of 2020. Artemis I will travel once around the Moon and back to Earth. Airbus in Bremen is already building the second Orion Service Module, with which astronauts will fly to the Moon and back to Earth for the first time (2022 / 2023).

(Images provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC