SpaceX Starship SN15 Faces Additional Delays | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, May 01, 2021

SpaceX Starship SN15 Faces Additional Delays

Massive Anticipation For The Much Upgraded SN15 Version Of Starship

After a number of successful, or seemingly successful static firings, the latest generation of SpaceX Starship test vehicles was rumored to be ready to fly on Friday.

But, whether it was the lousy weather, or technical details unknown to the public, it didn't quite come off. But then again, there been a lot of delays for SpaceX this week with the delay of the Crew One Dragon having been pushed back from Wednesday to, at this point, early Sunday -- again for weather.

Anticipation of SN15 is massive. After four vehicles wound up as little bit more than explosive residue following a series of somewhat successful, but not successful enough, tests; Elon Musk's crew skipped over a couple of serial numbers to bring a much upgraded version of the Starship, one which reportedly included "hundreds of upgrades, and modifications," to the launchpad.

This version, SN15 will follow a similar flight test as seen on SN's 8 through 11, with a vertical ascent to an altitude above 30,000 feet, followed by a temporary hover, and a transition to a belly to earth unpowered descent that is terminated by a radical pitch up and reignition of the three Raptor engines powering this prototype. Once power is stabilized, internal software selects which of the Raptors is performing best and uses that, primarily, to affect a targeted touchdown on a pad very close to where the flight started.

A previous vehicle, SN10, actually did all this… And sat triumphantly on its pad for the better part of 10 minutes before experiencing a well-known RUD… otherwise known as Rapid Unscheduled Disassembly, when internal structures that were compromised by a harder than expected landing, created an explosive finality to what had otherwise been a triumphant flight test.

The pressure is certainly on for SN15, especially now that this basic vehicle will someday be upgraded to become part of the Manned Lunar Lander that SpaceX plans to put on the moon in a few years. Having won a nearly $3 billion contract from NASA, as a sole source provider, all eyes are on SpaceX and Elon Musk, to see if the extraordinary successes he has pioneered over the last few years, will continue all the way to the moon.

FMI: www.SpaceX.com

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC