Boeing To Provide Airport And Airspace Modeling Services In Turkey | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Sun, Jun 26, 2016

Boeing To Provide Airport And Airspace Modeling Services In Turkey

Jeppesen TAAM Solution To Assist In Development Of Istanbul New Airport Airspace Design

Boeing has announced a new Technical Assistance Agreement with iGA Havalimani Isletmesi A.S. (IGA), the developer and operator of Istanbul New Airport.

Through the agreement, Boeing subsidiary Jeppesen will provide its Total Airport and Airspace Modeler (TAAM) solution to assist IGA and DHMI, Turkey’s General Directorate of State Airports Authority. This group will support the development of Istanbul New Airport airspace design, the airport operation optimization program and an operational readiness plan.

“We look forward to working with IGA and DHMI to find the most effective operational concepts for the Istanbul area, as part of the overall investment in the infrastructure of Turkish aerospace,” said Aysem Sargin, managing director of Boeing Turkey. “Using our TAAM tool, we will be able to show the impacts of all operational concepts and assist the Istanbul New Airport team to make the most informed decisions possible for the new airport.”

The state of the art Jeppesen TAAM analysis tool will be used with the IGA and DHMI teams to conduct studies that would potentially maximize Istanbul New Airport runway operations and overall airspace capacity and efficiency. Maintaining safety and minimizing airspace conflict within the regional Istanbul Terminal Control Area is another key aspect of the project.

Several operational procedure alternatives will be simulated and analyzed by TAAM to assist the new airport’s airspace and runway optimization process. Both IGA and DHMI will be trained to use the TAAM solution, allowing active participation in the project, as well as the ability to conduct their own continuing analysis projects, following the successful delivery of Jeppesen’s analysis.

(Source: Boeing news release)

FMI: www.boeing.com

Advertisement

More News

OSH25 Day 5 Redux: Avidyne Vantage 12, Is Fly-Inn An AeroBnB?, B25 Miss Mitchell

Also: Pratt & Whitney 747SP, Gratia Aero, Robinson/MagniX, Jack Pelton Part5 The Avidyne Vantage 12 is finally certified and will shortly be shipping out so that aging Cirrus a>[...]

ANN's Daily Aero-Linx (07.29.25)

Aero Linx: Army Aviation Medicine Association (AAVMA) The Society of US Army Flight Surgeons (SoUSAFS) serves to advance the science and art of Aerospace Medicine and its allied sc>[...]

NTSB Final Report: Curtiss Wright P-40E

Witnesses Reported That They Heard A Loss Of Engine Power Analysis: Witnesses reported that the airplane departed from runway 35 after a successful runup. During the initial climb,>[...]

ANN's Daily Aero-Term (07.29.25): Radio Magnetic Indicator

Radio Magnetic Indicator An aircraft navigational instrument coupled with a gyro compass or similar compass that indicates the direction of a selected NAVAID and indicates bearing >[...]

Aero-News: Quote of the Day (07.29.25)

"After exiting, I had a vague recollection of what just happened…and a much clearer view of how quickly hypoxia can sneak up. Sign-ups for PROTE are open each day of AirVent>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC