Boeing To Provide Airport And Airspace Modeling Services In Turkey | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Jun 26, 2016

Boeing To Provide Airport And Airspace Modeling Services In Turkey

Jeppesen TAAM Solution To Assist In Development Of Istanbul New Airport Airspace Design

Boeing has announced a new Technical Assistance Agreement with iGA Havalimani Isletmesi A.S. (IGA), the developer and operator of Istanbul New Airport.

Through the agreement, Boeing subsidiary Jeppesen will provide its Total Airport and Airspace Modeler (TAAM) solution to assist IGA and DHMI, Turkey’s General Directorate of State Airports Authority. This group will support the development of Istanbul New Airport airspace design, the airport operation optimization program and an operational readiness plan.

“We look forward to working with IGA and DHMI to find the most effective operational concepts for the Istanbul area, as part of the overall investment in the infrastructure of Turkish aerospace,” said Aysem Sargin, managing director of Boeing Turkey. “Using our TAAM tool, we will be able to show the impacts of all operational concepts and assist the Istanbul New Airport team to make the most informed decisions possible for the new airport.”

The state of the art Jeppesen TAAM analysis tool will be used with the IGA and DHMI teams to conduct studies that would potentially maximize Istanbul New Airport runway operations and overall airspace capacity and efficiency. Maintaining safety and minimizing airspace conflict within the regional Istanbul Terminal Control Area is another key aspect of the project.

Several operational procedure alternatives will be simulated and analyzed by TAAM to assist the new airport’s airspace and runway optimization process. Both IGA and DHMI will be trained to use the TAAM solution, allowing active participation in the project, as well as the ability to conduct their own continuing analysis projects, following the successful delivery of Jeppesen’s analysis.

(Source: Boeing news release)

FMI: www.boeing.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC