AD: New Piper | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jun 24, 2005

AD: New Piper

AD NUMBER: 2005-13-16
MANUFACTURER: New Piper
SUBJECT: Airworthiness Directive 2005-13-16
SUMMARY: The FAA adopts an airworthiness directive to supersede AD 93-24-14 applicable to all The New Piper Aircraft, Inc. (Piper) PA-34 series airplanes. This AD results from many service difficulty reports related to the collapse of the nose landing gear (NLG). Consequently, this AD retains the actions required in AD 93-24-14, requires you to inspect the NLG and components of the NLG using new procedures for rigging the nose gear installation, and requires you to replace unserviceable parts.

We are issuing this AD to detect, correct, and prevent failure in certain components of the NLG, lack of cleanliness of the NLG due to inadequate maintenance, or lack of lubricant in the NLG or NLG components. This failure of the NLG could lead to loss of control of the airplane during take-off, landing, or taxiing operations.

FMI: www.airweb.faa.gov/ad

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC