FAA Decision On Commercial Flights At Paine Field May Come Friday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Sep 14, 2012

FAA Decision On Commercial Flights At Paine Field May Come Friday

Two Regional Carriers Looking To Set Up Shop At Snohomish County Airport

The FAA has scheduled September 14 as the release date for its decision as to whether to allow commercial flights at Paine Field in Everett, WA. The airport is home to Boeing's main assembly plant, but has otherwise been traditionally considered a GA airport.

Horizon Air and Allegiant Air have both petitioned the FAA for the right to operate scheduled services at Paine Field, and they've been waiting for a decision for a long time. The Mukileto Beacon reports that an initial Environmental Assessment (EA) report was completed in December, 2009, and opened up for comments. At that time, the FAA said they would have a determination in "a few months."

The EA examined the impacts that commercial flights would have on the surrounding area in terms of air quality, traffic, and of course, noise. The 2009 draft EA said there would be no significant impact from allowing commercial operations at Paine Field.

The primary opponent of allowing scheduled air service at the airport is a group called "Save Our Communities" (SOC). The group's vice president Greg Hauth said that its primary concern is that once scheduled air service is allowed, there are "laws on the books that allow unrestricted growth at an airport." Hauth says that the draft EA did not take into account growth in the number of scheduled flights beyond an initial 12 per day. He said that the FAA purposely limited the scope of the study to avoid having to do a full Environmental Impact Statement as would have been required by the National Environmental Policy Act.

As to the delay, FAA spokesman Mike Fergus said that it had taken that long to digest the more than 900 comments that were received on the draft EA. Comments on the final EA will be open through October 14.

(Paine Field image from file)

FMI: Final Proposal, www.faa.gov

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC