Fourth Gulfstream G600 Test Aircraft Makes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jun 27, 2017

Fourth Gulfstream G600 Test Aircraft Makes First Flight

Production Aircraft In Completions For Interior Outfitting

The fourth Gulfstream G600 aircraft recently completed its debut flight just over six weeks after the third aircraft flew for the first time.

The G600 departed Savannah-Hilton Head International Airport at 6:50 p.m. June 21. During the 1-hour and 18-minute flight, the aircraft climbed to a maximum altitude of 51,000 feet and reached a maximum airspeed of Mach .925. The aircraft landed back in Savannah at 8:08 p.m. local time.

“To have four first flights and fly more than 570 hours in less than six months is a remarkable achievement,” said Dan Nale, senior vice president, Programs, Engineering and Test, Gulfstream. “The rapid maturity of this program is due to the work we did before the flying even started — the strategic planning, the research, the lab development — combined with the success we’ve had in the similar G500 program. Thanks to our concurrent flight-test programs, we can apply lessons learned from the more mature G500 program to the G600, resulting in a more streamlined certification effort.”

The fifth G600 test aircraft was recently delivered to the Savannah Completions center, where it will be transformed into a fully outfitted production aircraft. During flight test the aircraft will be used to validate interior elements and ensure the successful integration of aircraft systems with the passenger experience.

To date, the G600 program’s four test aircraft have accumulated more than 130 flights.

Gulfstream is on schedule to receive FAA type certification for the G600 in 2018, with customer deliveries scheduled for later in the year. As previously announced, the all-new, award-winning G500 is on schedule to achieve FAA type certification and enter service in the fourth quarter of this year.

(Image provided with Gulfstream news release)

FMI: www.gulfstream.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC