Navy Releases RFP For VXX Helicopter Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Nov 27, 2012

Navy Releases RFP For VXX Helicopter Program

First Step In Replacing 'Marine One' VIP Transport Aircraft

The U.S. Navy has released a draft Request for Proposal (RFP) beginning once again the process of replacing the helicopters which transport the President under the "Marine One" call sign. The RFP is the first step in the process of acquiring an aircraft to replace the aging fleet of VH-60N “Night Hawks” and VH-3D “Sea Kings,” both produced by Sikorsky.

According to the Navy draft RFP document, "the baseline aircraft from which the VXX will be derived should be certified by the FAA, a recognized civil airworthiness authority with bi-lateral agreement with the FAA, United States (U.S.) Military airworthiness certification authority or possess a clear, imminent path (to be demonstrated by the Offeror) to such certification if and when any proposals are submitted in response to a formal solicitation.

"The Government does not intend to impose bottom-up airworthiness criteria that would drive redesign, but plans to leverage the current certification basis with the cognizant civil or U.S. Military airworthiness certification authority to achieve a NAVAIR flight clearance.

"The Prime Contractor will be responsible for: 1) obtaining delta certification of the integrated VXX platform from the original certification authority, and 2) maintaining continued airworthiness certification of the integrated VXX platform with the original certification authority. In the event that the original certification authority is a foreign entity, certain elements of the VXX integration will require certification by a U.S. certification authority without the involvement of the original certification authority. For subsystems/components which the original certification authority will not or cannot certify, NAVAIR will provide delta certification of only those subsystems/components as long as such delta certification will not invalidate the certifications from the original certification authority."

Of course, this isn't the first time an RFP has been issued in this process. The most recent VXX program was cancelled in 2009 after numerous delays and cost overruns. Lockheed Martin had partnered with AgustaWestland and won the contract with a variant of the AW101 helicopter designated the VH-71 Kestrel.

Defense News reports that Lockheed plans to partner with Sikorsky this time around, but only for systems development. Sikorsky reportedly plans to base its bid on an aircraft built around the S-92 airframe. Boeing could get into the competition with an aircraft based on the Chinook, while AgustaWestland plans to partner with Northrop Grumman and re-offer an aircraft based on the AW101.

A Navy spokeswoman said that the final RFP is scheduled to be released in March of next year, with the contract award projected to come about a year later. The 2013 Pentagon budget includes about $1.85 billion for the program through 2017.

(Pictured, Top VH-71 Kestrel. Bottom Sikorsky S-92)

FMI: Draft RFP

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC