NASA Schedules New Escape System Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Jun 07, 2009

NASA Schedules New Escape System Test

New System Developed For Constellation Program

NASA's Max Launch Abort System, or MLAS, is scheduled to be tested June 15 at the agency's Wallops Flight Facility on Wallops Island, Va. The launch window extends from approximately 0545. to 0815 EDT.

The unpiloted test is part of an effort to design a system for safely propelling future spacecraft and crews away from hazards on the launch pad or during the climb to orbit. This system was developed as an alternative concept to the launch abort system chosen for NASA's Orion crew capsule. Orion, part of a new spacecraft system being developed by NASA's Constellation Program, is undergoing design reviews in preparation for flying humans to the International Space Station in 2015 and, later, to the moon.

MLAS is being tested to provide experience in flight testing a spacecraft to NASA's Engineering and Safety Center, which leads the project from NASA's Langley Research Center in Hampton, Va. The 33-foot-high MLAS vehicle will be launched to an altitude of approximately one mile to simulate an emergency on the launch pad.

A full-scale mockup of the crew module will separate from the launch vehicle and parachute into the Atlantic Ocean.

FMI: http://www.nasa.gov/centers/wallops/missions/mlas.html
 

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC