Mon, Jun 12, 2023
Supplier's Part Out of Spec, Exceeding Tolerances in Horizontal Stabilizer Assembly
The Dreamliner will see delays once again after Boeing discovered another manufacturing SNAFU inside the 787's construction.
The company said that it was inspecting all 787s in inventory in search of "a nonconforming condition related to a fitting on the horizontal stabilizer. The inspections and required rework will affect the timing of near-term 787 deliveries."
The issue is just the latest in a long line of quality woes encountered in the 787's troubled manufacturing history. The novel, liberal use of next-gen materials and lightweight composites have taken Boeing on a bit of a learning journey throughout the Dreamliner's production run, and recent issues continue that burgeoning tradition.
The affected part is a fitting that joins the horizontal stabilizer, sized incorrectly by a supplier. The pieces, when installed, were found to have created a gap greater than allowed in the blueprints, which are limited to a few thousandths of an inch on paper. Repairs will end up taking some time, along with going over Dreamliners in inventory to ensure nothing similar occurred with them, too. The horizontal stab issue is separate from a recent problem with the vertical one, uncovered in April. In that case, the issue was blamed on a 'nonstandard' procedure, and affected a handful of fittings that attached the tail to the fuselage. That fix alone has added months to Dreamliner delivery schedules, making customers wonder just how long they'll have to wait to get the next batch.
More News
How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]
Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]
NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]
Also: uAvionix AV-Link, F-16 Viper Demo, TN National Guard, 'Staff the Towers' A Saturday afternoon jump run, originating from SkyDive Kansas City, went bad when it was reported th>[...]
Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]