Pratt & Whitney, Levett Engineering Continue F135 Partnership In Australia | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 27, 2015

Pratt & Whitney, Levett Engineering Continue F135 Partnership In Australia

Sign Long-Term Agreement For Manufacture Of Critical Engine Components

Pratt & Whitney has signed a long term agreement (LTA) with Levett Engineering for the manufacture of critical F135 engine components. This LTA has an estimated value of more than $4 million over a five year period.

Levett Engineering, a precision component manufacturer located in Elizabeth, South Australia, has been supplying second and third stage turbine vane transfer tubes for the F135 engine since 2009. The current LTA encompasses the transfer tubes and additional, recently awarded, engine main bearing housings and supports.

"Levett competed and succeeded on a global stage at providing a best value manufacturing solution for the F135 engine and the F-35 program," said Mark Buongiorno, vice president, F135 engine program.  "This long term agreement underscores Pratt & Whitney's commitment to Australian F135 Industrial Participation."

"We are thrilled to have signed this LTA with Pratt & Whitney to manufacture and deliver these key F135 components," said Paul Levett, managing director, Levett Engineering. "Pratt & Whitney recognizes the excellent cost, high quality, and on-time delivery value that Levett provides and we are proud to grow our partnership with Pratt & Whitney as the F-35 program continues to accelerate."

The F135 has logged more than 5,700 flights, 21,000 flight hours and more than 800 vertical landings. To date, Pratt & Whitney has delivered 228 F135 engines, including both System Design and Development and production engines.

(Image from file)

FMI: www.pratt-whitney.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC