Pentagon Wants New Long Range Bomber | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Feb 06, 2006

Pentagon Wants New Long Range Bomber

But Can The Military Afford It?

While military strategists and BUFF pilots may passionately argue otherwise... the truth is that one day, the B-52 Stratofortress WILL stop flying. When that time comes (it's worth noting is hasn't yet in over 50 years) the Pentagon wants to be ready... so the military is making its plans now.

The new bomber would be on the flight line within the next dozen years, according to the latest Quadrennial Defense Review. The QDR states the US should develop a new, land-based, long-range bomber by 2018 -- while, at the same time, updating the current fleet of B-1, B-2 and, yes, B-52 aircraft.

"The new bomber is one of the biggest initiatives in the QDR report,” said Loren Thompson, a military analyst at the Virginia-based Lexington Institute, to the Fort Worth Star-Telegram.

If the Pentagon goes along with the proposal, it would mean substantially speeding up the development of a new bomber, which was supposed to be completed by 2037.

One of the questions faced by planners and designers alike is, will this new long-range bomber be manned or unmanned? The QDR says at least 45 percent of the country's future air fleet will be unmanned.

Don't count on a new bomber just yet, however. President Bush this week will present his budget proposal... and Treasury Secretary John Snow says it will be austere. The president has promised to cut the federal deficit in half by the time he leaves office -- which means reducing America's current deficit of $337 billion in the red to $189 billion.

Such a plan would likely leave very little room for the development of a new bomber.

FMI: www.af.mil

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC