F-35 Testing Aircraft Comes Full Circle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 13, 2012

F-35 Testing Aircraft Comes Full Circle

Aircraft Used In Static Test Program Returned To LMC In Fort Worth

After successfully completing the static test program on the F-35 (known as AG-1) BAE systems says it has returned the aircraft back to Lockheed Martin. BAE says the static test program broke all records for the speed of testing, having applied more than 150 different loading configurations in just over nine months. Now, after proving the strength of the aircraft, it is beginning the 4500 mile journey back to the U.S. after almost three and a half years in the structural test facility at Brough in the UK.

Static testing the F-35 means that the aircraft has been ‘flown’ to its limits with loads applied to it replicating the effect of high gravitational forces far beyond any conditions likely to be flown in actual flight.  This is done with the airframe nesting in a multi-million pound rig fitted with over 4000 strain gauges, 170 actuators and over 50 miles of wiring at our Brough site in Yorkshire. Brough is home to a facility well known for putting aircraft through their paces to ensure they are strong enough and resilient enough to perform in the harshest environments in the world.
 
“We certainly don’t give the aircraft an easy ride here," said Tim Bramhall, F-35 structural test program manager at Brough. "We push it to its limits so that we can be confident that each of the 3000+ aircraft that have been ordered will perform safely and effectively. The real challenge is keeping aircraft weight at a minimum while maintaining the strength of the plane within certain specified limits”   
 
“We still have another F-35 CTOL airframe in the facility undergoing fatigue testing along with the remaining "horizontal and vertical tails from the Carrier variant," Bramhall continued. Work on those continues on schedule and are shining examples of the long term future the structural test facility has ahead.”

FMI: www.baesystems.com

Advertisement

More News

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

FAA Seeks Info For New Brand-New ATC Platform

State-Of-The-Art Common Automation Platform To Replace Legacy Systems The FAA has issued a Request for Information (RFI) regarding the initiative of the Trump Administration and U.>[...]

USAF Reaper Drone Crashes Off the South Korean Coast

Kunsan Air Base Reported the Accident During Routine Operations The US Air Force has confirmed that it lost an MQ-9 Reaper drone to the South Korean waters on November 24. The airc>[...]

Hartzell Engine Tech Magneto Gains FAA-PMA

PowerUp S-1200 Series Approved, Available for 4- And 6-Cylinder Engines Hartzell Engine Tech announced it received FAA Parts Manufacturer Approval for its PowerUp S-1200 Series air>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC