F35 JSF Cleared For Return To Flight Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.21.25

Airborne-NextGen-04.22.25

AirborneUnlimited-04.23.25

Airborne-FltTraining-04.24.25

AirborneUnlimited-04.25.25

Tue, Aug 23, 2011

F35 JSF Cleared For Return To Flight Testing

Air Force Lifts Two-Week Grounding Following Power Issue

The U.S. Air Force has cleared the F35 JSF to return to flight testing following a two-week standdown. The program had been suspended following a problem that cropped up in a power system in one of the test airplanes stationed at Edwards Air Force Base.

An Air Force Safety Investigation Board continues to review the circumstances that led to the failure of an Integrated Power Package (IPP) aboard AF-4, an F-35A conventional takeoff and landing (CTOL) variant assigned to Edwards AFB, CA, on August 2. The F-35's Integrated Power Package is a turbo-machine that provides power to start the engine and generates cooling for the aircraft. The government and contractor engineering teams determined the program could resume developmental test flight operations while the investigation continues. This assessment was made after reviewing data from ground and flight tests which showed, with revised test monitoring procedures governing the IPP, the aircraft can be flown safely.

A news release from the JSF Program Office indicates that the root cause investigation indicates that an IPP valve did not function properly. Monitoring of valve position is a mitigating action to allow monitored operations. A permanent resolution is in work. The return to flight has been approved for all aircraft assigned to Edwards AFB and Patuxent River Naval Air Station, MD. This does not allow ground operations for Eglin AFB, FL, delivered aircraft (AF-8, AF-9). The completion of the root cause investigation and any corrective actions are required to return to unmonitored operations.

Impact to System Development and Demonstration test flight execution and production operations continues to be assessed. The program, however, has built margin into the test schedule to accommodate incidents that occur in the development effort.

FMI: www.jsf.mil

Advertisement

More News

Aero-News: Quote of the Day (04.28.25)

“While legendary World War II aircraft such as the Corsair and P-51 Mustang still were widely flown at the start of the Korean War in 1950, a new age of jets rapidly came to >[...]

ANN's Daily Aero-Term (04.28.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (04.28.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

Airborne-Flight Training 04.24.25: GA Refocused, Seminole/Epic, WestJet v TFWP

Also: Cal Poly Aviation Club, $$un Country, Arkansas Aviation Academy, Teamsters Local 2118 In response to two recent general aviation accidents that made national headlines, more >[...]

Aero-News: Quote of the Day (04.29.25)

“The FAA is tasked with ensuring our skies are safe, and they do a great job at it, but there is something about the system that is holding up the medical process. Obviously,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC