AD: Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Tue, Oct 29, 2013

AD: Boeing Company Airplanes

AD NUMBER: 2013-21-03

PRODUCT: Certain The Boeing Company Model 747-8F and 747-8 series airplanes.
SUBJECT: Airworthiness Directive 2013-21-03
ACTION: Final Rule; request for comments.

SUMMARY: This AD requires a detailed inspection of the power control actuator (PCA) installation to determine if a bushing is installed, a general visual inspection between the horizontal stabilizer rear spar and the elevator front spar and between certain stabilizer stations for defects and damage, and corrective actions if necessary.

This AD was prompted by a report of unusual noise coming from the left inboard elevator during a functional check of the ram air turbine system, and a determination that a bushing was not installed. The FAA is issuing this AD to detect and correct non-installation of bushings. If the bushings are not present, the stiffness of the load path will be decreased, which will cause wear of adjacent parts and increased freeplay of the elevator surfaces. Freeplay that exceeds acceptable limits could result in divergent flutter for certain maneuvers, which could lead to loss of controllability of the airplane.

DATES: This AD is effective November 12, 2013. Comments on this AD must be received by December 9, 2013.

FMI: AD

Advertisement

More News

Klyde Morris (10.27.25)

It Does Indeed Work Every Time, Klyde FMI: www.klydemorris.com>[...]

Airborne 10.27.25: MOSAIC Phase 1, Katana Returns, MOSAIC Town Hall!

Also: Orlando Air Show Cancelled, ATC Staffing Shortages, CH-47F Block II Chinooks, Sustainable $$ More than a decade of hard work, legal setbacks, and community advocacy has final>[...]

Airborne-NextGen 10.28.25: Police Drones, Nat'l Parks v UAVs, MOSAIC Phase 1

Also: MOSAIC Town Hall, Lockheed Martin Venus, Electric Aircraft Cooling, Korea Taps Archer The Miami-Dade Sheriff’s Office is at the front end of a year-long AI policing exp>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

NTSB Final Report: Airbus A321-271N (A1); Cessna 172N (A2)

The Local Controller’s Poor Judgment In Prioritization Of Their Ground Traffic Ahead Of Their Airborne Traffic Analysis: Hawaiian Airlines flight 70 (HAL70), N2165HA, an Airb>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC