Bend, OR Working On Updated Airport Master Plan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, May 11, 2019

Bend, OR Working On Updated Airport Master Plan

Looks To Expand Airport To Accommodate Growth

The city of Bend, OR is working at the request of the FAA to produce a new Airport Master Plan with an eye towards airport expansion.

The Bend Bulletin newspaper reports that the city is currently holding "listening sessions" with stakeholders with an eventual goal of winning AIP grants for big ticket items like a control tower, more hangars and a longer runway.

The expansion plans are the result of increased aviation activity at Bend Municipal Airport (KBDN), which airport manager Gary Judd is being driven largely by the shortage of professional pilots. Flight training is a major activity at KBDN.

Damon Runberg, Oregon Employment Department regional economist, told the paper that the airport supports 450 jobs, with more than 100 added in the past two years. It contributes $174 million annual to the economy of Central Oregon.

Like many airports, KDBN fell on some hard times during the 2008 recession, and Roger Lee, CEO of Economic Development for Central Oregon said while the recovery has been slow, it's been steady.

The city last updated its Airport Master Plan in 2013, which included a $22 million, 1,000-foot runway extension that was never built. FAA spokesman Allen Kenitzer told the paper that the agency normally looks for an updated plane every seven years, but that timeframe can be compressed if there is a lot of activity at a particular airport. In an email sent to the paper, Kenitzer said Bend "undertook the master plan update due, in part, because the airport had substantially completed its near term projects. In addition, the airport thought it needed a longer runway, and that would need to be evaluated via the master planning process.”

FMI: Source report

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC